aboutsummaryrefslogtreecommitdiffhomepage
path: root/specification/references/D01B/simples/2005.txt
diff options
context:
space:
mode:
Diffstat (limited to 'specification/references/D01B/simples/2005.txt')
-rw-r--r--specification/references/D01B/simples/2005.txt2516
1 files changed, 2516 insertions, 0 deletions
diff --git a/specification/references/D01B/simples/2005.txt b/specification/references/D01B/simples/2005.txt
new file mode 100644
index 0000000..d9a7b43
--- /dev/null
+++ b/specification/references/D01B/simples/2005.txt
@@ -0,0 +1,2516 @@
1
2* 2005 Date or time or period function code qualifier [C]
3
4 Desc: Code qualifying the function of a date, time or
5 period.
6
7 Repr: an..3
8
9 1 Service completion date/time, actual
10 Actual date/time on which the service was completed.
11
12 2 Delivery date/time, requested
13 Date on which buyer requests goods to be delivered.
14
15 3 Invoice date/time
16 [2376] Date when a Commercial Invoice is issued.
17
18 4 Order date/time
19 [2010] Date when an order is issued.
20
21 5 Saleable stock demand cover period, expected
22 A period of time when saleable stocks are expected to
23 cover demand for a product.
24
25 6 Moved from location date
26 The date an entity moved from a location.
27
28 7 Effective date/time
29 Date and/or time at which specified event or document
30 becomes effective.
31
32 8 Order received date/time
33 Date/time when the purchase order is received by the
34 seller.
35
36 9 Processing date/time
37 Date/time of processing.
38
39 10 Shipment date/time, requested
40 Date on which goods should be shipped or despatched by
41 the supplier.
42
43 11 Despatch date and or time
44 (2170) Date/time on which the goods are or are expected
45 to be despatched or shipped.
46
47 12 Terms discount due date/time
48 Date by which payment should be made if discount terms
49 are to apply.
50
51 13 Terms net due date
52 Date by which payment must be made.
53
54 14 Payment date/time, deferred
55 Date/time when instalments are due.
56
57 15 Promotion start date/time
58 Date/time when promotion activities begin.
59
60 16 Promotion end date/time
61 Date/time when promotion activities end.
62
63 17 Delivery date/time, estimated
64 Date and/or time when the shipper of the goods expects
65 delivery will take place.
66
67 18 Installation date/time/period
68 The date/time/period of the act, or an instance of
69 installing something or someone.
70
71 19 Meat ageing period
72 Period of time between slaughter and delivery during
73 which meat is ageing.
74
75 20 Cheque date/time
76 Date/time when cheque is issued.
77
78 21 Charge back date/time
79 The date/time of the charge back.
80
81 22 Freight bill date/time
82 Date/time when freight bill is issued.
83
84 23 Equipment reconditioning date/time, actual
85 Actual date/time of the reconditioning of a piece of
86 equipment.
87
88 24 Transfer note acceptance date and time
89 Date and time when a transfer note (transfer document
90 for transport exclusively using containers as equipment)
91 is recognised as being valid by the carrier.
92
93 35 Delivery date/time, actual
94 Date/time on which goods or consignment are delivered at
95 their destination.
96
97 36 Expiry date
98 Date of expiry of the validity of a referenced document,
99 price information or any other referenced data element
100 with a limited validity period.
101
102 37 Ship not before date/time
103 Goods should not be shipped before given date/time.
104
105 38 Ship not later than date/time
106 Date/time by which the goods should have been shipped.
107
108 39 Ship week of date
109 Date identifying the week during which goods should be
110 shipped.
111
112 40 Clinical information issue date and/or time
113 Date and/or time when clinical information is issued.
114
115 41 Event duration, expected
116 The expected duration of an event.
117
118 42 Superseded date/time
119 Date/time being overlaid by a date given elsewhere.
120
121 43 Event duration, intended
122 The intended duration of an event.
123
124 44 Availability
125 Date/time when received item is available.
126
127 45 Compilation date and time
128 Date and time of the compilation.
129
130 46 Cancellation date
131 Date on which a document or message has been cancelled.
132
133 47 Statistical time series date
134 Date for statistical time series purposes.
135
136 48 Duration
137 Duration.
138
139 49 Deliver not before and not after dates
140 Deliver not before and not after a specific date range.
141
142 50 Goods receipt date/time
143 Date/time upon which the goods were received by a given
144 party.
145
146 51 Cumulative quantity start date
147 First Date for accumulation of delivery quantities.
148
149 52 Cumulative quantity end date
150 Last Date for accumulation of delivery quantities.
151
152 53 Buyer's local time
153 Time at the buyer's location.
154
155 54 Seller's local time
156 Time at the seller's location.
157
158 55 Confirmed date/time
159 Date/time which has been confirmed.
160
161 56 Original authorisation date and/or time
162 Date and/or time when original authorisation was issued.
163
164 57 Precaution relevant period
165 The period when a precaution is relevant.
166
167 58 Clearance date (Customs)
168 (3080) Date on which Customs formalities necessary to
169 allow goods to be exported, to enter home use, or to be
170 placed under another Customs procedure has been
171 accomplished (CCC).
172
173 59 Inbound movement authorization date
174 Inland movement authorization date.
175
176 60 Engineering change level date
177 Date the engineering level of goods is changed.
178
179 61 Cancel if not delivered by this date
180 The date on which cancellation should take place, if
181 delivery has not occurred.
182
183 62 Excluded date
184 Date excluded from a period of time.
185
186 63 Delivery date/time, latest
187 Date identifying a point of time after which goods shall
188 not or will not be delivered.
189
190 64 Delivery date/time, earliest
191 Date identifying a point in time before which the goods
192 shall not be delivered.
193
194 65 Delivery date/time, 1st schedule
195 The first scheduled date/time for delivery.
196
197 66 Excluded period
198 An interval of time excluded from a period of time.
199
200 67 Delivery date/time, current schedule
201 Delivery Date deriving from actual schedule.
202
203 68 Additional period
204 An interval of time added to a period of time.
205
206 69 Delivery date/time, promised for
207 [2138] Date by which, or period within which, the
208 merchandise should be delivered to the buyer, as agreed
209 between the seller and the buyer (generic term).
210
211 70 Additional date
212 Date added to a period of time.
213
214 71 Delivery date/time, requested for (after and including)
215 Delivery is requested to happen after or on given date.
216
217 72 Delivery date/time, promised for (after and including)
218 Delivery might take place earliest at given date.
219
220 73 Guarantee period
221 The period for which the guarantee is or will be
222 granted.
223
224 74 Delivery date/time, requested for (prior to and including)
225 Delivery is requested to happen prior to or including
226 the given date.
227
228 75 Delivery date/time, promised for (prior to and including)
229 Delivery might take place latest at given date.
230
231 76 Delivery date/time, scheduled for
232 The date/time for which delivery is scheduled.
233
234 77 Specification revision date
235 Date of revision to a specification.
236
237 78 Event date/time/period, actual
238 The actual date/time/period an event occurred.
239
240 79 Shipment date/time, promised for
241 Shipment might happen at given date/time.
242
243 80 Planning end date and/or time, actual
244 The actual date and/or time the planning ended.
245
246 81 Shipment date/time, requested for (after and including)
247 Shipment should happen earliest at given date.
248
249 82 Medicine administration time
250 Designated time of day for the administration of
251 medicine.
252
253 83 Dispensing interval, minimum
254 The shortest interval allowed between one dispensing of
255 an item and the next dispensing of the same item.
256
257 84 Shipment date/time, requested for (prior to and including)
258 Shipment should take place latest at given date.
259
260 85 Shipment date/time, promised for (prior to and including)
261 Shipment might take place latest at given date.
262
263 86 Medication date/time, start
264 Date and/or time when medication was started.
265
266 87 Travel service connection time
267 Time elapsing between the arrival of a travel service
268 and the departure of a connecting travel service.
269
270 88 Summer time, start
271 Date/time at which the summer time starts.
272
273 89 Inquiry date
274 The date on which an inquiry is made.
275
276 90 Report start date
277 The date on which a report is to begin.
278
279 91 Report end date
280 The date on which a report is to end.
281
282 92 Contract effective date
283 Date when a contract becomes valid.
284
285 93 Contract expiry date
286 Date when a contract expires.
287
288 94 Production/manufacture date
289 Date on which goods are produced.
290
291 95 Bill of lading date
292 Date as specified on the bill of lading.
293
294 96 Discharge date/time
295 Date/time when goods should, might or have been
296 discharged from the means of transport.
297
298 97 Transaction creation date
299 The date on which a transaction was originated or
300 brought into being.
301
302 98 Winter time, start
303 Date/time at which the winter time starts.
304
305 99 Quotation opening date
306 The date on which the quotation has been or may be
307 opened.
308
309 100 Product ageing period before delivery
310 Period of time before delivery during which the product
311 is ageing.
312
313 101 Production date, no schedule established as of
314 Date as of there is no valid production schedule.
315
316 102 Health problem period
317 Period of time of health problem.
318
319 103 Closing date/time for breakbulk STORO
320 Date/time on which delivering period for breakbulk STORO
321 cargo ends (STORO = Stowing on Roll on-Roll off vessel).
322
323 104 Closing date/time for container RO-RO
324 Date/time on which delivering period for container Roll
325 on-Roll off (RO-RO) cargo ends.
326
327 105 Starting date/time for breakbulk STORO
328 Date/time on which delivering period for breakbulk STORO
329 cargo starts (STORO = Stowing on Roll on-Roll off
330 vessel).
331
332 106 Starting date/time for container RO-RO
333 Date/time on which delivering period for container Roll
334 on-Roll off (RO-RO) cargo starts.
335
336 107 Deposit date/time
337 The date/time on which a deposit was made.
338
339 108 Postmark date/time
340 An official mark stamped on a letter identifying
341 date/time of dispatch or arrival.
342
343 109 Receive at lockbox date
344 The date on which a financial institution, serving as
345 collection agency for a company located in another part
346 of the country, collects an amount of money on behalf of
347 that company.
348
349 110 Ship date, originally scheduled
350 The date on which the shipment of goods was originally
351 scheduled.
352
353 111 Manifest/ship notice date
354 The date of issuance of a manifest or ship notice.
355
356 112 First interest-bearing date
357 The first date from which interest is borne.
358
359 113 Sample required date
360 Date as of a sample has to be available customer
361 defined.
362
363 114 Tooling required date
364 Date as of a tool has to be available customer defined.
365
366 115 Sample available date
367 Date as of a sample will be available seller defined.
368
369 116 Equipment return period, expected
370 Period until which equipment is expected to be hired.
371
372 117 Delivery date/time, first
373 First possible date/time for delivery.
374
375 118 Cargo booking confirmed date/time
376 Date/time at which the cargo booking has been accepted
377 by the carrier.
378
379 119 Test completion date
380 Date when a test has been completed.
381
382 120 Last interest-bearing date
383 The last date from which interest is borne.
384
385 121 Entry date
386 Date of entry.
387
388 122 Contract completion date
389 The date a contract is completed.
390
391 123 Documentary credit expiry date/time
392 The latest date/time for presentation of the documents
393 to the bank where the credit expires.
394
395 124 Despatch note date
396 [2218] Date when a Despatch Note is issued.
397
398 125 Import licence date
399 [2292] Date when Import Licence is issued.
400
401 126 Contract date
402 [2326] Date when a Contract is agreed.
403
404 127 Previous report date
405 Date of the previous report.
406
407 128 Delivery date/time, last
408 Date when the last delivery should be or has been
409 accomplished.
410
411 129 Exportation date
412 Date when imported vessel/merchandise last left the
413 country of export for the country of import.
414
415 130 Current report date
416 Date of the current report.
417
418 131 Tax point date
419 Date on which tax is due or calculated.
420
421 132 Arrival date/time, estimated
422 (2348) Date/time when carrier estimates that a means of
423 transport should arrive at the port of discharge or
424 place of destination.
425
426 133 Departure date/time, estimated
427 Date/time when carrier estimates that a means of
428 transport should depart at the place of departure.
429
430 134 Rate of exchange date/time
431 Date/time on which the exchange rate was fixed.
432
433 135 Telex date
434 Date identifying when a telex message was sent.
435
436 136 Departure date/time
437 [2280] Date (and time) of departure of means of
438 transport.
439
440 137 Document/message date/time
441 (2006) Date/time when a document/message is issued. This
442 may include authentication.
443
444 138 Payment date
445 [2034] Date on which an amount due is made available to
446 the creditor, in accordance with the terms of payment.
447
448 139 Property mortgage date, start
449 The date the mortgage on a piece of property begins.
450
451 140 Payment due date
452 Date/time at which funds should be made available.
453
454 141 Presentation date of Goods declaration (Customs)
455 [2032] Date on which a Goods declaration is presented or
456 lodged with Customs.
457
458 142 Labour wage determination date
459 The date a labour wage is determined.
460
461 143 Acceptance date/time of goods
462 [2126] Date on which the goods are taken over by the
463 carrier at the place of acceptance (CMR 4).
464
465 144 Quota date
466 Date that the quota applies to.
467
468 145 Event date
469 A date specifying an event.
470
471 146 Entry date, estimated (Customs)
472 Date on which the official date of Customs entry is
473 anticipated.
474
475 147 Expiry date of export licence
476 [2078] Date of expiry of the validity of an Export
477 Licence.
478
479 148 Acceptance date of Goods declaration (Customs)
480 [2036] Date on which a Goods declaration is accepted by
481 Customs in accordance with Customs legislation.
482
483 149 Invoice date, required
484 Date required for invoice issue.
485
486 150 Declaration/presentation date
487 Date when item has been or has to be declared/presented.
488
489 151 Importation date
490 Date on which goods are imported, as determined by the
491 governing Customs administration.
492
493 152 Exportation date for textiles
494 Date when imported textiles last left the country of
495 origin for the country of importation.
496
497 153 Cancellation date/time, latest
498 The latest date/time on which cancellation of the
499 payment order may be requested.
500
501 154 Acceptance date of document
502 The date on which a document was accepted.
503
504 155 Accounting period start date
505 The first date of an accounting period.
506
507 156 Accounting period end date
508 The last date of an accounting period.
509
510 157 Validity start date
511 The first date of a period for which something is valid.
512
513 158 Horizon start date
514 The first date of a period forming a horizon.
515
516 159 Horizon end date
517 The last date of a period forming a horizon.
518
519 160 Authorization date
520 Date when an authorization was given.
521
522 161 Release date of customer
523 Date the customer authorised the goods' release.
524
525 162 Release date of supplier
526 Date when the supplier released goods.
527
528 163 Processing start date/time
529 Date/Time when a specific process starts.
530
531 164 Processing end date/time
532 Date/Time when a specific process ends.
533
534 165 Tax period start date
535 Date when a tax period begins.
536
537 166 Tax period end date
538 Date when a tax period ends.
539
540 167 Charge period start date
541 The charge period's first date.
542
543 168 Charge period end date
544 The charge period's last date.
545
546 169 Lead time
547 Time required between order entry till earliest goods
548 delivery.
549
550 170 Settlement due date
551 More generic than 'payment due date' and therefore more
552 apt for reinsurance/insurance business.
553
554 171 Reference date/time
555 Date/time on which the reference was issued.
556
557 172 Hired from date
558 Date from which an item has been or will be hired.
559
560 173 Hired until date
561 Date until which an item has been or will be hired.
562
563 174 Advise after date/time
564 The information must be advised after the date/time
565 indicated.
566
567 175 Advise before date/time
568 The information must be advised before the date/time
569 indicated.
570
571 176 Advise completed date/time
572 The advise has been completed at the date indicated.
573
574 177 Advise on date/time
575 The information must be advised on the date/time
576 indicated.
577
578 178 Arrival date/time, actual
579 [2106] Date (and time) of arrival of means of transport.
580
581 179 Booking date/time
582 Date at which the booking was made.
583
584 180 Closing date/time
585 Final date for delivering cargo to a liner ship.
586
587 181 Positioning date/time of equipment
588 Date/time when equipment is positioned.
589
590 182 Issue date
591 Date when a document/message has been or will be issued.
592
593 183 Date, as at
594 Date related to a given context.
595
596 184 Notification date/time
597 Date/time of notification.
598
599 185 Commenced tank cleaning date/time
600 The date/and or time tank cleaning was started.
601
602 186 Departure date/time, actual
603 (2280) Date (and time) of departure of means of
604 transport.
605
606 187 Authentication date/time of document
607 Date/time when the document is signed or otherwise
608 authenticated.
609
610 188 Previous current account date
611 Date of the previous current account.
612
613 189 Departure date/time, scheduled
614 Date (and time) of scheduled departure of means of
615 transport.
616
617 190 Transhipment date/time
618 Date and time of the transfer of the goods from one
619 means of transport to another.
620
621 191 Delivery date/time, expected
622 Date/time on which goods are expected to be delivered.
623
624 192 Expiration date/time of customs document
625 Date on which validity of a customs document expires.
626
627 193 Execution date
628 The date when ordered bank initiated the transaction.
629
630 194 Start date/time
631 Date/time on which a period starts.
632
633 195 Expiry date of import licence
634 [2272] Date of expiry of the validity of an Import
635 Licence.
636
637 196 Departure date/time, earliest
638 Date/time of earliest departure of means of transport.
639
640 197 Lay-time first day
641 First of a number of days allowed in a charter party of
642 the loading and discharging of cargo.
643
644 198 Lay-time last day
645 Last of a number of days allowed in a charter party for
646 the loading and discharging of cargo.
647
648 199 Positioning date/time of goods
649 The date and/or time the goods have to be or have been
650 positioned.
651
652 200 Pick-up/collection date/time of cargo
653 Date/time at which the cargo is picked up.
654
655 201 Pick-up date/time of equipment
656 Date/time at which the equipment is picked up.
657
658 202 Posting date
659 The date when an entry is posted to an account.
660
661 203 Execution date/time, requested
662 The date/time on which the ordered bank is requested to
663 initiate the payment order, as specified by the
664 originator (e.g. the date of the debit).
665
666 204 Release date (Customs)
667 Date on which Customs releases merchandise to the
668 carrier or importer.
669
670 205 Settlement date
671 Date for settlement of financial transaction e.g.
672 foreign exchange securities.
673
674 206 End date/time
675 Date/time on which a period (from - to) ends.
676
677 207 Commenced pumping ballast date/time
678 Date/time on which the intake of materials to be carried
679 to improve the trim and the stability of the means of
680 transport, was commenced.
681
682 208 Departure date/time, ultimate
683 Date/time at which a means of transport has to depart
684 ultimately.
685
686 209 Value date
687 Date on which the funds are at the disposal of the
688 beneficiary or cease to be at the disposal of the
689 ordering customer.
690
691 210 Reinsurance current account period
692 The date of the current reinsurance account.
693
694 211 360/30
695 Calculation is based on year of 360 days, month of 30
696 days.
697
698 212 360/28-31
699 Calculation is based on year of 360 days, month of 28-31
700 days.
701
702 213 365-6/30
703 Calculation is based on year of 365-6 days, month of 30
704 days.
705
706 214 365-6/28-31
707 Calculation is based on year of 365-6 days, month of 28-
708 31 days.
709
710 215 365/28-31
711 Calculation is based on year of 365 days, month of 28-31
712 days.
713
714 216 365/30
715 Calculation is based on year of 365 days, month of 30
716 days.
717
718 217 From date of award to latest delivery
719 Lead time to determine the latest date a delivery can be
720 made based on the date an award is made.
721
722 218 Authentication/validation date/time
723 The date/time of authentication and/or validation.
724
725 219 Crossborder date/time
726 Date/time at which goods are transferred across a
727 country border.
728
729 220 Property mortgage scheduled date, end
730 The date the mortgage on a piece of property is
731 scheduled to end.
732
733 221 Interest period
734 Number of days used for the calculation of interests.
735
736 222 Presentation date, latest
737 Latest date for presentation of a document.
738
739 223 Delivery date/time, deferred
740 New date and time of delivery calculated on basis of a
741 consignee's requirement (chargeable).
742
743 224 Permit to admit date
744 Date on which permission was granted to move merchandise
745 into a bonded warehouse or free trade zone.
746
747 225 Certification of weight date/time
748 Date/time at which the carrier proceeds to the weighting
749 of the goods.
750
751 226 Discrepancy date/time
752 Date/time at which a discrepancy has been found.
753
754 227 Beneficiary's banks due date
755 Date on which funds should be made available to the
756 beneficiary's bank.
757
758 228 Debit value date, requested
759 Date on which the account owner wants the debit value to
760 his account.
761
762 229 Hoses connected date/time
763 The date and/or time hoses were connected.
764
765 230 Hoses disconnected date/time
766 The date and/or time hoses were disconnected.
767
768 231 Arrival date/time, earliest
769 Date/time of earliest arrival of means of transport.
770
771 232 Arrival date/time, scheduled
772 Date (and time) of scheduled arrival of means of
773 transport.
774
775 233 Arrival date/time, ultimate
776 Date (and time) of ultimate arrival of means of
777 transport.
778
779 234 Collection date/time, earliest
780 The transport order may be issued before the goods are
781 ready for picking up. This date/time indicates from when
782 on the carrier can have access to the consignment.
783
784 235 Collection date/time, latest
785 In relation with the arrangements agreed between buyer
786 and seller or between sender and main transport it may
787 be necessary to specify the latest collection date/time.
788
789 236 Completed pumping ballast date/time
790 Date/time at which the intake of materials, to be
791 carried to improve the trim and the stability of the
792 means of transport, was completed.
793
794 237 Completed tank cleaning date/time
795 The date and/or time tank cleaning was completed.
796
797 238 Tanks accepted date/time
798 The date and/or time the tanks are to be or have been
799 accepted.
800
801 239 Tanks inspected date/time
802 The date and/or time the tanks are to be or have been
803 inspected.
804
805 240 Reinsurance accounting period
806 To identify a reinsurance account period via start and
807 end dates.
808
809 Note:
810 1. This period is not the same as "reinsurance current
811 account period".
812
813 241 From date of award to earliest delivery
814 Lead time to determine the earliest date a delivery can
815 be made based on the date an award is made.
816
817 242 Preparation date/time of document
818 Date and/or time that the document was prepared.
819
820 243 Transmission date/time of document
821 The date/time at which a document was transmitted.
822
823 244 Settlement date, planned
824 The date for which settlement is planned.
825
826 245 Underwriting year
827 Year in which the treaty was commenced.
828
829 246 Accounting year
830 Year considered for accounting of the treaty or portion
831 of the treaty.
832
833 247 Year of occurrence
834 Year in which a specific event (e.g. a loss) took place.
835
836 248 Loss
837 Date, time, period on which a referenced loss occurred.
838
839 249 Cash call date
840 Date on which a cash call was made for a loss suffered
841 and covered.
842
843 250 Re-exportation date
844 Date of re-exportation.
845
846 251 Re-importation date
847 Date of re-importation.
848
849 252 Arrival date/time at initial port
850 Date/time that the conveyance arrives at the initial
851 port in the country of destination.
852
853 253 Departure date/time from last port of call
854 Date/time that conveyance departed from the last foreign
855 port of call.
856
857 254 Registration date of previous Customs declaration
858 Registration date of the Customs declaration for the
859 previous Customs procedure either in the same or another
860 country.
861
862 255 Availability due date
863 Date when ordered items should be available at a
864 specified location.
865
866 256 From date of award to completion
867 Lead time to determine the completion date of an effort
868 based on the date an award is made.
869
870 257 Calculation date/time/period
871 The date/time/period on which a calculation will take,
872 or has taken, place.
873
874 258 Guarantee date
875 Date when a guarantee is placed.
876
877 259 Conveyance registration date
878 Date when a vessel, vehicle or other means of transport
879 was registered by a competent authority.
880
881 260 Valuation date (Customs)
882 Date when Customs valuation was made.
883
884 261 Release date/time
885 Date/time assigned to identify the release of a set of
886 rules, conditions, conventions, productions, etc.
887
888 262 Closure date/time/period
889 Date/time/period when an enterprise is closed.
890
891 263 Invoicing period
892 Period for which an invoice is issued.
893
894 264 Release frequency
895 Frequency of a release.
896
897 265 Due date
898 The date on which some action should occur.
899
900 266 Validation date
901 The date on which something was made valid, ratified or
902 confirmed.
903
904 267 Rate/price date/time
905 Date/time on which a rate/price is determined.
906
907 268 Transit time/limits
908 The time to go over a distance.
909
910 269 Discharge date/time, started
911 Date/time when discharge operations were started.
912
913 270 Ship during date
914 The date identifying the period during or in which the
915 goods should be shipped.
916
917 271 Ship on or about date
918 Date on or about which goods should be shipped.
919
920 272 Documentary credit presentation period
921 The specification of the period of time, expressed in
922 number of days, after the date of issuance of the
923 transport document(s) within which the documents must be
924 presented.
925
926 273 Validity period
927 Dates (from/to)/period referenced documents are valid.
928
929 274 From date of order receipt to sample ready
930 Lead time is the defined timespan.
931
932 275 From date of tooling authorization to sample ready
933 Lead time is the defined timespan.
934
935 276 From date of receipt of tooling aids to sample ready
936 Lead time is the defined timespan.
937
938 277 From date of sample approval to first product shipment
939 Lead time is the defined timespan.
940
941 278 From date of order receipt to shipment
942 Lead time is the defined timespan.
943
944 279 From date of order receipt to delivery
945 Lead time is the defined timespan.
946
947 280 From last booked order to delivery
948 Lead time is the defined timespan.
949
950 281 Date of order lead time
951 Lead time is referenced to the date of order.
952
953 282 Confirmation date lead time
954 Lead time is referenced to the date of confirmation.
955
956 283 Arrival date/time of transport lead time
957 Lead time is referenced to the date a transport will
958 arrive or has arrived.
959
960 284 Before inventory is replenished based on stock check lead
961 time
962 Lead time is the defined timespan.
963
964 285 Invitation to tender date/time
965 Date/time on which the invitation to tender has been
966 made available to relevant parties.
967
968 286 Tender submission date/time
969 Date/time on which the tender was submitted.
970
971 287 Contract award date/time
972 Date/time on which the contract is awarded to a
973 tenderer.
974
975 288 Price base date/time
976 Base date/time of prices.
977
978 289 Interest rate validity period
979 Validity period of the interest rate.
980
981 290 Contractual start date/time
982 Date/time on which activities stated in the contract
983 must start.
984
985 291 Start date/time, planned
986 The date/time for which something is planned to begin or
987 commence.
988
989 292 Works completion date/time, planned
990 The date/time for the completion of building or repair
991 operations is planned.
992
993 293 Works completion date/time, actual
994 The actual date/time for the completion of building or
995 repair operations.
996
997 294 Hand over date/time, planned
998 Date/time on which hand over (i.e. the transfer of
999 responsibility for an object or activity such as
1000 documentation, system etc. from one party to another) is
1001 planned to take place.
1002
1003 295 Hand over date/time, actual
1004 Date/time on which hand over (i.e. the transfer of
1005 responsibility for an object or activity such as
1006 documentation, system etc. from one party to another)
1007 actually takes place.
1008
1009 296 Retention release date/time
1010 Date/time on which the retention is released.
1011
1012 297 Retention release date/time, partial
1013 Date/time on which the retention is partially released.
1014
1015 298 Escalation start date
1016 Value date of the indexes appearing as denominators in
1017 an escalation formula.
1018
1019 299 Price adjustment start date
1020 Value date of the indexes appearing as denominators in a
1021 price adjustment formula.
1022
1023 300 Price adjustment limit date
1024 Limit value date of indexes used as numerators in a
1025 price adjustment formula.
1026
1027 301 Value date of index
1028 Date of validity of index values.
1029
1030 302 Publication date
1031 The date of the act of making something publicly known.
1032
1033 303 Escalation date
1034 Value date of indexes appearing as numerators in an
1035 escalation formula.
1036
1037 304 Price adjustment date
1038 Value date of indexes appearing as numerators in a price
1039 adjustment formula.
1040
1041 305 Latest price adjustment date
1042 Date on which the latest price adjustment took place.
1043
1044 306 Work period
1045 Period of execution of works.
1046
1047 307 Payment instruction date/time
1048 Date/time on which a payment instruction was given.
1049
1050 308 Payment valuation presentation date/time
1051 Date/time on which the payment valuation is presented.
1052
1053#| 309 Banks' value date
1054 Date on which the funds are at the disposal of the
1055 receiving bank or cease to be at the disposal of the
1056 sending bank.
1057
1058 310 Received date/time
1059 Date/time of receipt.
1060
1061 311 On
1062 Fixed maturity day for deferred payment or time
1063 draft(s).
1064
1065 312 Ship not before and not after date/time
1066 Shipment(s) of goods is/are to be made not before the
1067 first specified date/time and not after the second
1068 specified date/time.
1069
1070 313 Order to proceed date
1071 Issue date of an instruction to start work.
1072
1073 314 Planned duration of works
1074 The period of time planned for the completion of
1075 building or repair operations.
1076
1077 315 Agreement to pay date
1078 Date on which the debtor agreed to pay.
1079
1080 316 Valuation date/time
1081 Date/time of valuation.
1082
1083 317 Reply date
1084 The date to answer or to respond in word or action.
1085
1086 318 Request date
1087 The date on which something was asked for.
1088
1089 319 Customer value date
1090 Date at which funds are taken into account for interest
1091 calculation (in debit or credit).
1092
1093 320 Declaration reference period
1094 Reference period of a set of items reported on the same
1095 declaration.
1096
1097 321 Promotion date/period
1098 Date/period relevant for specific promotion activities.
1099
1100 322 Accounting period
1101 Self-explanatory.
1102
1103 323 Horizon period
1104 Period forming a (planning) horizon.
1105
1106 324 Processing date/period
1107 Date/period a specific process happened/will happen.
1108
1109 325 Tax period
1110 Period a tax rate/tax amount etc. is applicable.
1111
1112 326 Charge period
1113 Period a specified charge is valid for.
1114
1115 327 Instalment payment due date
1116 Self-explanatory.
1117
1118 328 Payroll deduction date/time
1119 Date/time of a monetary deduction made from the salary
1120 of a person on a payroll.
1121
1122 329 Birth date/time
1123 Date/time when a person was born.
1124
1125 330 Joined employer date
1126 Date when a person joins an employer.
1127
1128 331 Contributions ceasing date/time
1129 Date/time when contributions cease.
1130
1131 332 Contribution period end date/time
1132 Date/time when a contribution period ends.
1133
1134 333 Part-time working change date/time
1135 Date/time when the proportion of part-time work changes.
1136
1137 334 Status change date/time
1138 Date/time when a status changes.
1139
1140 335 Contribution period start date/time
1141 Date/time when a contribution period commences.
1142
1143 336 Salary change effective date
1144 Date when a change in salary becomes effective.
1145
1146 337 Left employer date
1147 Date when a person leaves an employer.
1148
1149 338 Benefit change date/time
1150 Date/time when a benefit provided by a service provider
1151 is changed.
1152
1153 339 Category change date/time
1154 Date/time when a change of category is made.
1155
1156 340 Joined fund date/time
1157 Date/time when a person joins a fund.
1158
1159 341 Waiting time
1160 The period of time between the moment at which one wants
1161 an activity to begin and the moment at which this
1162 activity can actually begin.
1163
1164 342 On-board date
1165 The date goods have been loaded on board of a
1166 conveyance.
1167
1168 343 Date/time of discount termination
1169 Date/time when the deduction from an amount comes to an
1170 end.
1171
1172 344 Date/time of interest due
1173 Date/time when the interest has to be paid.
1174
1175 345 Days of operation
1176 Week days of operation.
1177
1178 346 Latest check-in time
1179 Latest time of check-in.
1180
1181 347 Slaughtering start date
1182 Date on which slaughtering commenced.
1183
1184 348 Packing start date
1185 Date on which packing commenced.
1186
1187 349 Packing end date
1188 Date on which packing completed.
1189
1190 350 Test start date
1191 Date when a test has been started.
1192
1193 351 Inspection date
1194 Date of inspection.
1195
1196 352 Slaughtering end date
1197 Date on which slaughtering completed.
1198
1199 353 Accounting transaction date
1200 Date to which an accounting transaction refers.
1201
1202 354 Activity period date range
1203 A specific date range associated with an activity.
1204
1205 355 Contractual delivery date
1206 The date of delivery contractually agreed between
1207 parties.
1208
1209 356 Sales date, and or time, and or period
1210 The date, and or time, and or period on which a sale
1211 took place.
1212
1213 357 Cancel if not published by this date
1214 Cancel if not published by this date.
1215
1216 358 Scheduled for delivery on or after
1217 Scheduled for delivery on or after the specified date,
1218 and or time.
1219
1220 359 Scheduled for delivery on or before
1221 Scheduled for delivery on or before specified date and
1222 or time.
1223
1224 360 Sell by date
1225 The date by which a product should be sold.
1226
1227 361 Best before date
1228 The best before date.
1229
1230 362 End availability date
1231 The end date of availability.
1232
1233 363 Total shelf life period
1234 A period indicating the total shelf life of a product.
1235
1236 364 Minimum shelf life remaining at time of despatch period
1237 Period indicating the minimum shelf life remaining for a
1238 product at the time of leaving the supplier.
1239
1240 365 Packaging date
1241 The date on which the packaging of a product took place.
1242
1243 366 Inventory report date
1244 Date on which a inventory report is made.
1245
1246 367 Previous meter reading date
1247 Date on which the previous reading of a meter took
1248 place.
1249
1250 368 Latest meter reading date
1251 Date on which the latest reading of a meter took place.
1252
1253 369 Date and or time of handling, estimated
1254 The date and or time when the handling action is
1255 estimated to take place.
1256
1257 370 Date when container equipment becomes domestic
1258 The date on which foreign-built container equipment has
1259 entered into the commerce of another country and has
1260 become domestic equipment.
1261
1262 371 Hydrotest date
1263 The date equipment has been hydrotested.
1264
1265 372 Equipment pre-trip date
1266 The date on which equipment is pre-tripped.
1267
1268 373 Mooring, date and time
1269 Date and time of mooring.
1270
1271 374 Road fund tax expiry date
1272 The date of expiry of the road fund tax.
1273
1274 375 Date of first registration
1275 Date of first registration.
1276
1277 376 Biannual terminal inspection date
1278 The date on which a biannual inspection of a terminal
1279 has taken or will take place.
1280
1281 377 Federal HighWay Administration (FHWA) inspection date
1282 The date on which container equipment is to be or has
1283 been inspected in accordance with the requirements of
1284 the U.S. Federal Highway Administration.
1285
1286 378 Container Safety Convention (CSC) inspection date
1287 The date on which container equipment is to be or has
1288 been inspected as per the Container Safety Convention
1289 (CSC).
1290
1291 379 Periodic inspection date
1292 The date on which a periodic inspection has to take
1293 place.
1294
1295 380 Drawing revision date
1296 Date the drawing revision has been allocated to a
1297 design.
1298
1299 381 Product lifespan at time of production
1300 The total lifespan of a product at the time of its
1301 production.
1302
1303 382 Earliest sale date
1304 The earliest date on which the product may be made
1305 available for sale.
1306
1307 383 Cancel if not shipped by this date
1308 Cancel the order if goods not shipped by this date.
1309
1310 384 Previous invoice date
1311 Indicates the date which was allocated to a previous
1312 invoice.
1313
1314 385 Payment cancelled, violation of agreement
1315 Date/time when a payment is cancelled due to the fact
1316 that the transaction does not comply with the agreement.
1317
1318 386 Payment cancelled due to administrative error
1319 Date/time when a payment is cancelled due to an
1320 administrative error.
1321
1322 387 Repair turnaround time
1323 Provides the period of time necessary to turnaround a
1324 given repair.
1325
1326 388 Order amendment binding date
1327 The date when an order amendment becomes binding for
1328 both parties.
1329
1330 389 Cure time
1331 Specifies the length of time that an article was or
1332 should be cured.
1333
1334 390 From date of award to delivery
1335 Lead time to determine the delivery date based on the
1336 date an award is made.
1337
1338 391 From date of receipt of item to approval
1339 Lead time to determine the date an item will be approved
1340 based on the date the item was received.
1341
1342 392 Equipment collection or pick-up date/time, earliest
1343 Date/time on which equipment can be picked up at the
1344 earliest.
1345
1346 393 Equipment collection or pick-up date/time, planned
1347 Date/time on which equipment can be picked up, either
1348 full or empty, according to a planning.
1349
1350 394 Equipment positioning date/time, actual
1351 Date/time on which equipment was actually positioned
1352 (delivered).
1353
1354 395 Equipment positioning date/time, estimated
1355 Date/time on which equipment is estimated to be
1356 positioned (delivered).
1357
1358 396 Equipment positioning date/time, requested
1359 Date/time on which equipment is requested to be
1360 positioned (delivered).
1361
1362 397 Equipment positioning date/time, ultimate
1363 Date/time on which equipment should be positioned
1364 (delivered) at the latest.
1365
1366 398 Goods collection or pick-up date/time, planned
1367 Date/time at which goods can be picked up, according to
1368 a planning.
1369
1370 399 Goods positioning date/time, expected
1371 Date/time on which goods are expected to be positioned.
1372
1373 400 Cargo release date/time, ultimate
1374 Ultimate date/time at which goods or equipment should be
1375 released.
1376
1377 401 Container Safety Convention (CSC) plate expiration date
1378 Date on which the validity of a Container Safety
1379 Convention (CSC) plate expires.
1380
1381 402 Document received date/time
1382 Date/time on which the document was actually received.
1383
1384 403 Discharge date/time, actual
1385 Date/time when the specified goods or transport
1386 equipment has or have been discharged from the means of
1387 transport.
1388
1389 404 Loading date/time, actual
1390 Date/time when the specified goods or transport
1391 equipment has or have been loaded in or on the means of
1392 transport.
1393
1394 405 Equipment collection or pick-up date/time, actual
1395 Date/time on which the equipment was actually collected.
1396
1397 406 Goods positioning date/time, planned
1398 The date/time on which the goods will be positioned
1399 according to a planning.
1400
1401 407 Document requested date/time
1402 Date/time on which the document is requested by a party.
1403
1404 408 Expected container hire from date/time
1405 Estimated date and time when the containers are expected
1406 to go on-hire.
1407
1408 409 Order completion date/time, ultimate
1409 Date/time on which the order should be completed at the
1410 latest.
1411
1412 410 Equipment repair ready date/time, ultimate
1413 Ultimate date/time on which a piece of equipment must be
1414 repaired.
1415
1416 411 Container stuffing date/time, ultimate
1417 Date/time on which the container stuffing should be
1418 completed at the latest.
1419
1420 412 Container stripping date/time, ultimate
1421 Date/time on which the container stripping should be
1422 completed at the latest.
1423
1424 413 Discharge and loading completed date/time
1425 Date/time when all discharge and loading operations on
1426 the transport means have been completed.
1427
1428 414 Equipment stock check date/time
1429 Date/time on which equipment has been ascertained as
1430 being in stock.
1431
1432 415 Activity reporting date
1433 The date applicable to the activity being reported.
1434
1435 416 Submission date
1436 The date of a submission.
1437
1438 417 Previous booking date/time
1439 Date/time at which the previous booking was made.
1440
1441 418 Minimum shelf life remaining at time of receipt
1442 The minimum shelf life remaining at the time of receipt.
1443
1444 419 Forecast period
1445 A period for which a forecast applies.
1446
1447 420 Unloaded, date and time
1448 To report the date and time that an unloading action
1449 occurred.
1450
1451 421 Estimated acceptance date
1452 To estimate the date of acceptance.
1453
1454 422 Documentary credit issue date
1455 The date the documentary credit has been issued.
1456
1457 423 First date of ordering
1458 The first date on which ordering may take place.
1459
1460 424 Last date of ordering
1461 The last date on which ordering may take place.
1462
1463 425 Original posting date
1464 Date when the entry was originally posted.
1465
1466 426 Reinsurance payment frequency
1467 The frequency of payments of reinsurance premiums.
1468
1469 427 Adjusted age
1470 The adjusted age used for purposes of calculation.
1471
1472 428 Original issue age
1473 The original issue age.
1474
1475 429 Coverage duration
1476 The period coverage has been in force.
1477
1478 430 Coverage issue date
1479 Date from which the anniversary coverage is measured.
1480
1481 431 Flat extra period
1482 Period for charging the additional extra.
1483
1484 432 Paid to date
1485 Date to which payments have been paid.
1486
1487 433 Reinsurance coverage duration
1488 The period for which reinsurance coverage has been in
1489 force.
1490
1491 434 Maturity date
1492 Date at which maturity occurs.
1493
1494 435 Reinsurance issue age
1495 The actual or equivalent age at time of issue.
1496
1497 436 Reinsurance paid-up date
1498 The date up to which the reinsurance has been paid.
1499
1500 437 Benefit period
1501 The period of time for which benefits are provided.
1502
1503 438 Disability wait period
1504 The period of time the insured must be disabled before
1505 reinsurance coverage becomes effective.
1506
1507 439 Deferred Period
1508 The period of time for which an activity has been
1509 postponed.
1510
1511 440 Documentary credit amendment date
1512 Date of amendment of a documentary credit.
1513
1514 441 Last on hire date
1515 Date the item was last placed on hire.
1516
1517 442 Last off hire date
1518 Date the item was last returned from hire.
1519
1520 443 Direct interchange date
1521 Date the item was directly interchanged.
1522
1523 444 Approval date
1524 Date of approval.
1525
1526 445 Original estimate date
1527 The date of the original estimate.
1528
1529 446 Revised estimate date
1530 The date the estimate was revised.
1531
1532 447 Creditor's requested value date
1533 Date on which the creditor requests to be credited.
1534
1535 448 Referenced item creation date
1536 Creation date of referenced item.
1537
1538 449 Date for the last update
1539 Date for the last update.
1540
1541 450 Opening date
1542 Date of opening.
1543
1544 451 Source document capture date
1545 Date source document data is entered into a business
1546 application.
1547
1548 452 Trial balance period
1549 Period covered by the trial balance.
1550
1551 453 Date of source document
1552 The date of the source document.
1553
1554 454 Accounting value date
1555 Date against which the entry has to be legally
1556 allocated.
1557
1558 455 Expected value date
1559 Date on which the funds are expected to be at the
1560 disposal of the beneficiary.
1561
1562 456 Chart of account period
1563 Period covered by the chart of account.
1564
1565 457 Date of separation
1566 Date of marital separation.
1567
1568 458 Date of divorce
1569 Date when two married persons are officially divorced.
1570
1571 459 Date of marriage
1572 Date when two persons are married.
1573
1574 460 Wage period, start date
1575 Date when a period of wage begins.
1576
1577 461 Wage period, end date
1578 Date when a period of wage ends.
1579
1580 462 Working period, start date
1581 Date when a period of work begins.
1582
1583 463 Working period, end date
1584 Date when a period of work ends.
1585
1586 464 Embarkation date and time
1587 Date and time at which crew and/or passengers board.
1588
1589 465 Disembarkation date and time
1590 Date and time at which crew and/or passengers disembark.
1591
1592 466 Time now date
1593 A time now date used for planning and scheduling
1594 purposes.
1595
1596 467 Holiday
1597 A date or period that is a break from work.
1598
1599 468 Non working
1600 To specify a non working date or period.
1601
1602 469 Start date or time, earliest
1603 The earliest date or time for starting.
1604
1605 470 Start date or time, latest
1606 The latest date or time for starting.
1607
1608 471 Finish date or time, earliest
1609 The earliest date or time for finishing.
1610
1611 472 Finish date or time, latest
1612 The latest date or time for finishing.
1613
1614 473 Start date or time, mandatory
1615 The mandatory date or time for starting.
1616
1617 474 Finish date or time, mandatory
1618 The mandatory date or time for finishing.
1619
1620 475 Start date or time, actual
1621 The actual date or time for starting.
1622
1623 476 Start date or time, estimated
1624 The estimated date or time for starting.
1625
1626 477 Completion date or time, estimated
1627 The estimated date or time for completion.
1628
1629 478 Start date or time, scheduled
1630 The scheduled date or time for starting.
1631
1632 479 Completion date or time, scheduled
1633 The scheduled date or time for completion.
1634
1635 480 Start date or time, not before
1636 The not before date or time for starting.
1637
1638 481 Start date or time, not after
1639 The not after date or time for starting.
1640
1641 482 Completion date or time, not before
1642 The not before date or time for completion.
1643
1644 483 Completion date or time, not after
1645 The not after date or time for completion.
1646
1647 484 Illness recovery date, expected
1648 Date when a person is expected to recover from illness.
1649
1650 485 Period of illness, start date
1651 Date when a period of illness began.
1652
1653 486 Period of illness, end date
1654 Date when a period of illness ends.
1655
1656 487 Decease date
1657 Date when a person died.
1658
1659 488 Benefit period, start date
1660 Date when a period of benefit begins.
1661
1662 489 Benefit period, end date
1663 Date when a period of benefit ends.
1664
1665 490 Selection period, start date
1666 Date when a period of selection begins.
1667
1668 491 Selection period, end date
1669 Date when a period of selection ends.
1670
1671 492 Balance date/time/period
1672 The date/time/period of a balance.
1673
1674 493 Benefit payments termination date
1675 To identify the date on which benefit payments have
1676 ceased.
1677
1678 494 Covered income period
1679 To identify the period over which covered income is
1680 measured.
1681
1682 495 Current income period
1683 To identify the period over which current income is
1684 measured.
1685
1686 496 Reinstatement date
1687 Identifies the date of reinstatement.
1688
1689 497 Definition of disability duration
1690 To identify the period for which the definition of
1691 disability applies.
1692
1693 498 Previous termination date
1694 Identifies the date of the previous termination.
1695
1696 499 Premium change period
1697 To identify the period of the premium change.
1698
1699 500 Off-hire survey date
1700 Date on which the equipment was surveyed at the end of
1701 the current leasing period.
1702
1703 501 In service survey date
1704 Date of survey of equipment while in use.
1705
1706 502 On hire survey date
1707 Date on which the equipment was surveyed at the
1708 beginning of the current leasing period.
1709
1710 503 Production inspection date
1711 Date of production inspection.
1712
1713 504 Overtime, start date
1714 Date when a period of overtime begins.
1715
1716 505 Overtime, end date
1717 Date when a period of overtime ends.
1718
1719 506 Back order delivery date/time/period
1720 The date/time/period during which the delivery of a back
1721 order will take, or has taken, place.
1722
1723 507 Negotiations start date
1724 The date on which negotiations started.
1725
1726 508 Work effective start date
1727 The date on which work will effectively start.
1728
1729 509 Contract binding date
1730 The date from which a contract becomes binding on the
1731 contracting parties.
1732
1733 510 Notification time limit
1734 The time limit which has been set for a notification to
1735 take place.
1736
1737 511 Time limit
1738 The time limit in which an event must take place.
1739
1740 512 Attendance date and or time and or period
1741 Date and or time and or period of attendance.
1742
1743 513 Accident date and or time
1744 Date and or time when an accident occurred.
1745
1746 514 Adoption date, actual
1747 Actual date when adoption occurs.
1748
1749 515 Reimbursement claim issue date and or time
1750 Date and or time when a reimbursement claim is issued.
1751
1752 516 Hospital admission date and or time
1753 Date and or time of admission to a hospital.
1754
1755 517 Hospital discharge date and or time
1756 Date and or time of discharge from a hospital.
1757
1758 518 Period of care start date and or time
1759 Date and or time when a period of care starts.
1760
1761 519 Period of care end date and or time
1762 Date and or time when a period of care ends.
1763
1764 520 Department admission date and or time
1765 Date and or time of admission to a department.
1766
1767 521 Department discharge date and or time
1768 Date and or time of discharge from a department.
1769
1770 522 Childbirth date and or time, actual
1771 Actual date and or time of childbirth.
1772
1773 523 Prescription issue date and or time
1774 Date and or time when a prescription was issued.
1775
1776 524 Prescription dispensing date and or time
1777 Date and or time when a prescription was dispensed.
1778
1779 525 Clinical examination date and or time
1780 Date and or time of clinical examination.
1781
1782 526 Death date and or time
1783 Date and or time of death.
1784
1785 527 Childbirth date, estimated
1786 Estimated date of childbirth.
1787
1788 528 Last menstrual cycle, start date
1789 Date when the last menstrual cycle started.
1790
1791 529 Pregnancy duration, actual
1792 Actual duration of pregnancy.
1793
1794 530 Fumigation date and/or time
1795 The date/or time on which fumigation is to occur or has
1796 taken place.
1797
1798 531 Payment period
1799 A period of time in which a payment has been or will be
1800 made.
1801
1802 532 Average delivery delay
1803 The average delay between deliveries.
1804
1805 533 Budget line application date
1806 The date on which something has been applied to a budget
1807 line.
1808
1809 534 Date of repair or service
1810 The date of a repair or service.
1811
1812 535 Date of product failure
1813 The date the product failed.
1814
1815 536 Review date
1816 Date the item was or will be reviewed.
1817
1818 537 International review cycle start date
1819 Date the international review cycle starts.
1820
1821 538 International assessment approval for publication date
1822 Date the Data Maintenance Request (DMR) was approved for
1823 publication after completing international review.
1824
1825 539 Status assignment date
1826 Date a status was assigned.
1827
1828 540 Instruction's original execution date
1829 Original execution date for the instruction.
1830
1831 541 First published date
1832 Date when material was first published.
1833
1834 542 Last published date
1835 Date when material was last published.
1836
1837 543 Balance sheet date, latest
1838 Date of the latest balance sheet.
1839
1840 544 Security share price as of given date
1841 Date of the security share price.
1842
1843 545 Assigned date
1844 Date when assigned.
1845
1846 546 Business opened date
1847 Date opened for business.
1848
1849 547 Initial financial accounts filed date
1850 Date when the initial financial accounts were filed.
1851
1852 548 Stop work as of given date
1853 Date work stopped or will stop.
1854
1855 549 Completion date
1856 Date of completion.
1857
1858 550 Lease term, start date
1859 Start date of the lease term.
1860
1861 551 Lease term, end date
1862 End date of the lease term.
1863
1864 552 Start date, actual
1865 Actual date of start.
1866
1867 553 Start date, estimated
1868 Date of estimated start.
1869
1870 554 Filed date
1871 Date when filed.
1872
1873 555 Return to work date
1874 Date of return to work.
1875
1876 556 Purchased date
1877 Date of purchase.
1878
1879 557 Returned date
1880 Date return takes place.
1881
1882 558 Changed date
1883 Date change takes place.
1884
1885 559 Terminated date
1886 Date termination takes place.
1887
1888 560 Evaluation date
1889 Date evaluation takes place.
1890
1891 561 Business termination date
1892 Date the business terminates.
1893
1894 562 Release from bankruptcy date
1895 Date when an entity is released from bankruptcy status.
1896
1897 563 Placement date, initial
1898 Date of initial placement.
1899
1900 564 Signature date
1901 Date of signature.
1902
1903 565 Bankruptcy filed date
1904 Date when bankruptcy was filed.
1905
1906 566 End date, scheduled
1907 Date when activity is scheduled to end.
1908
1909 567 Report period
1910 Period covered by the report.
1911
1912 568 Suspended date
1913 Date of suspension.
1914
1915 569 Renewal date
1916 Date of renewal.
1917
1918 570 Reported date
1919 Date when reported.
1920
1921 571 Checked date
1922 Date when checked.
1923
1924 572 Present residence, start date
1925 The beginning date of residence at present location.
1926
1927 573 Employment position, start date
1928 The start date of employment in a particular position.
1929
1930 574 Account closed date
1931 Date when account was closed.
1932
1933 575 Construction date, actual
1934 Date of actual construction.
1935
1936 576 Employment profession start date
1937 Start date of employment in a particular profession.
1938
1939 577 Next review date
1940 Date of next review.
1941
1942 578 Meeting date
1943 Date of the meeting.
1944
1945 579 Administrator ordered date
1946 Date when an administrator is ordered for a company.
1947
1948 580 Last date to file a claim
1949 Date after which no claim can be filed.
1950
1951 581 Convicted date
1952 Date when convicted.
1953
1954 582 Interviewed date
1955 Date of an interview.
1956
1957 583 Last visit date
1958 Date of last visit.
1959
1960 584 Future period
1961 Period in the future.
1962
1963 585 Preceding period
1964 Period preceding current period.
1965
1966 586 Expected problem resolution date
1967 Date when problem is expected to be resolved.
1968
1969 587 Action date
1970 Date of action.
1971
1972 588 Accountant's opinion date
1973 Date of an accountant's opinion.
1974
1975 589 Last activity date
1976 Date of last activity.
1977
1978 590 Resolved date
1979 Date when resolved.
1980
1981 591 Recorded date
1982 Date when recorded.
1983
1984 592 Date of birth, estimated
1985 The estimated date of birth.
1986
1987 593 Last annual report date
1988 Date of the last annual report.
1989
1990 594 Net worth date
1991 Date of net worth.
1992
1993 595 Payment cancellation rejected
1994 Date/time when a cancellation of a payment is rejected
1995 due to the fact that the payment is already done.
1996
1997 596 Profit period
1998 Period over which profit was earned.
1999
2000 597 Registration date
2001 Date when registered.
2002
2003 598 Consolidation date
2004 Date when consolidation occurred.
2005
2006 599 Board of directors not authorised as of given date
2007 As of this date the board of directors is not
2008 authorised.
2009
2010 600 Board of directors not complete as of given date
2011 As of this date the board of directors is not fully
2012 filled.
2013
2014 601 Manager not registered as of given date
2015 As of this date the manager is not registered.
2016
2017 602 Citizenship change date
2018 Date of citizenship change.
2019
2020 603 Participation date
2021 Date of participation.
2022
2023 604 Capitalisation date
2024 Date of capitalisation.
2025
2026 605 Board of directors registration date
2027 Date when the board of directors was registered.
2028
2029 606 Operations ceased date
2030 Date when operations ceased.
2031
2032 607 Satisfaction date
2033 Date when satisfaction was obtained.
2034
2035 608 Legal settlement terms met date
2036 Date when terms specified in the legal settlement were
2037 met.
2038
2039 609 Business control change date
2040 Date when a new authority took control.
2041
2042 610 Court registration date
2043 Date of registration in the court.
2044
2045 611 Annual report due date
2046 Date when annual report is due.
2047
2048 612 Asset and liability schedule date
2049 Date of the asset and liability schedule.
2050
2051 613 Annual report mailing date
2052 Date when the annual report was mailed.
2053
2054 614 Annual report filing date
2055 Date when the annual report was filed.
2056
2057 615 Annual report delinquent on date
2058 Date when annual report was considered delinquent.
2059
2060 616 Accounting methodology change date
2061 Date when accounting methodology was changed.
2062
2063 617 Closed until date
2064 Date when again open.
2065
2066 618 Conversion into holding company date
2067 Date business was converted into a holding company.
2068
2069 619 Deed not available as of given date
2070 Date when deed was not available.
2071
2072 620 Detrimental information receipt date
2073 Date when detrimental information was received.
2074
2075 621 Construction date, estimated
2076 Estimated date of construction.
2077
2078 622 Financial information date
2079 Date of the financial information.
2080
2081 623 Graduation date
2082 Date when graduation occurs.
2083
2084 624 Insolvency discharge granted date
2085 Date when insolvency discharge was granted.
2086
2087 625 Incorporation date
2088 Date of incorporation.
2089
2090 626 Inactivity end date
2091 Date when inactivity ends.
2092
2093 627 Last check for balance sheet update date
2094 Date balance sheet was last checked to determine if
2095 update had taken place.
2096
2097 628 Last capital change date
2098 Date of last capital change.
2099
2100 629 Letter of agreement date
2101 Date of a letter of agreement.
2102
2103 630 Letter of liability date
2104 Date of a letter of liability.
2105
2106 631 Liquidation date
2107 Date of liquidation.
2108
2109 632 Lowest activity period
2110 Period of lowest activity.
2111
2112 633 Legal structure change date
2113 Date when legal structure was changed.
2114
2115 634 Current name effective date
2116 Date when current name became effective.
2117
2118 635 Not registered as of given date
2119 Date when not yet registered.
2120
2121 636 Current authority control start date
2122 Date when current authority took control.
2123
2124 637 Privilege details verification date
2125 Date when privilege details were verified.
2126
2127 638 Current legal structure effective date
2128 Date when current legal structure became effective.
2129
2130 639 Peak activity period
2131 Period of peak activity.
2132
2133 640 Presentation to bankruptcy receivers date
2134 Date when presented to the bankruptcy receivers.
2135
2136 641 Resignation date
2137 Date of resignation.
2138
2139 642 Legal action closed date
2140 Date when the legal action was closed.
2141
2142 643 Mail receipt date
2143 Date mail was received.
2144
2145 644 Social security claims verification date
2146 Date when social security claims were verified.
2147
2148 645 Sole directorship registration date
2149 Date when sole directorship was registered.
2150
2151 646 Trade style registration date
2152 Date when trade style was registered.
2153
2154 647 Trial start date, scheduled
2155 Date when a trial is scheduled to begin.
2156
2157 648 Trial start date, actual
2158 Date when the trial actually started.
2159
2160 649 Value Added Tax (VAT) claims verification date
2161 Date when the Value Added Tax (VAT) claims were
2162 verified.
2163
2164 650 Receivership result date
2165 Date when the result of the receivership occurs.
2166
2167 651 Investigation end date
2168 The date when an investigation ended.
2169
2170 652 Employee temporary laid-off period end date
2171 The ending date of a period in which employees were
2172 temporarily placed out of work.
2173
2174 653 Investigation start date
2175 The date when an investigation began.
2176
2177 654 Income period
2178 The period of time in which income is earned.
2179
2180 655 Criminal sentence duration
2181 The period of time over which a criminal sentence
2182 applies.
2183
2184 656 Age
2185 The length of time that a person or thing has existed.
2186
2187 657 Receivables collection period
2188 The period of time over which receivable accounts are
2189 collected.
2190
2191 658 Comparison period
2192 The time period covered in a comparison.
2193
2194 659 Adjournment
2195 The period of time over which an adjournment is in
2196 effect.
2197
2198 660 Court dismissal date
2199 The date on which a court refused further hearing of a
2200 case.
2201
2202 661 Insufficient assets judgement date
2203 The date on which assets were judged to be insufficient.
2204
2205 662 Average payment period
2206 The average period of time over which money has been
2207 paid.
2208
2209 663 Forecast period start
2210 The beginning of a forecast period.
2211
2212 664 Period extended
2213 Number of time units added to the original end
2214 date/time/period.
2215
2216 665 Employee temporary laid-off period start date
2217 The start date of a period in which employees were
2218 temporarily placed out of work.
2219
2220 666 Management available date
2221 Date when management is available.
2222
2223 667 Withdrawn date
2224 The date when something was retracted.
2225
2226 668 Claim incurred date
2227 The date that the claim was incurred.
2228
2229 669 Financial coverage period
2230 The period of time for which financial coverage applies.
2231
2232 670 Claim made date
2233 The date on which a claim was made.
2234
2235 671 Stop distribution date
2236 The date on which distribution is to stop.
2237
2238 672 Period assigned
2239 The period assigned.
2240
2241 673 Lease period
2242 The period associated with a lease.
2243
2244 674 Forecast period end date
2245 The ending date of a forecast period.
2246
2247 675 Judgement date
2248 The date on which a decision from a court of law was
2249 rendered.
2250
2251 676 Period worked for the company
2252 Period of time that was worked for the company.
2253
2254 677 Transport equipment stuffing date and/or time
2255 The date and/or time on which the stuffing of transport
2256 equipment is to or has taken place.
2257
2258 678 Transport equipment stripping date and/or time
2259 The date and/or time on which the stripping of a
2260 transport equipment is to or has taken place.
2261
2262 679 Initial request date
2263 Date of an initial request.
2264
2265 680 Period overdue
2266 The period by which an event is overdue.
2267
2268 681 Implementation date/time/period
2269 A date/time/period within which an implementation is to
2270 take place.
2271
2272 682 Refusal period
2273 The period within which a refusal can be made.
2274
2275 683 Suspension period
2276 The period for which something is suspended.
2277
2278 684 Deletion date
2279 The date on which deletion occurs.
2280
2281 685 First sale date and/or time and/or period
2282 The first date, and/or time, and/or period a product was
2283 sold.
2284
2285 686 Last sale date and/or time and/or period
2286 The last date, and/or time, and/or period a product was
2287 sold.
2288
2289 687 Date ready for collection
2290 A date on which an object is ready for collection.
2291
2292 688 Shipping date, no schedule established as of
2293 As at this date no valid shipping schedule has been
2294 established.
2295
2296 689 Shipping date and/or time, current schedule
2297 Shipping date and/or time as currently scheduled.
2298
2299 690 Suppliers' average credit period
2300 The average period of time that credit is extended by
2301 suppliers.
2302
2303 691 Advising date
2304 Date of advice.
2305
2306 692 Project over target baseline date
2307 The date an over target baseline was implemented for a
2308 project.
2309
2310 693 Established date
2311 Date when an entity was established or created.
2312
2313 694 Latest filing period
2314 Latest period for which a filing may be made.
2315
2316 695 Mailing date
2317 Date when an item may be mailed.
2318
2319 696 Date/time of latest accounts filing at public registry
2320 The latest date/time when financial accounts were filed
2321 at public registry.
2322
2323 697 Date placed in disfavour
2324 Date when placed in a disfavoured category or status.
2325
2326 698 Employment position start date, estimated
2327 Estimated start date of employment in a particular
2328 position.
2329
2330 699 Registered contractor number assignment date, original
2331 Date when a registered contractor number was originally
2332 assigned.
2333
2334 700 Ownership change date
2335 Date when ownership changes.
2336
2337 701 Original duration
2338 Original length of time.
2339
2340 702 Period between changes
2341 The period of time between changes.
2342
2343 703 From date of notice to proceed to commencement of
2344 performance
2345 Period of time from notice to proceed until performance
2346 commencement.
2347
2348 704 From date of notice to proceed to completion
2349 Period of time from date of notice to proceed until
2350 completion.
2351
2352 705 Period an event is late due to customer
2353 The period of time an event is late due to the actions
2354 of a customer.
2355
2356 706 File generation date and/or time
2357 Date and, or time of file generation.
2358
2359 707 Endorsed certificate issue date
2360 Date on which a certificate, endorsed by signature or
2361 other agreed means, is issued.
2362
2363 708 Patient first visit for condition
2364 The date of the first visit by a patient to a healthcare
2365 provider for this condition.
2366
2367 709 Admission date and/or time, expected
2368 Expected date and/or time of admission.
2369
2370 710 Symptoms onset, patient alleged
2371 Date and/or time of onset of symptoms according to the
2372 patient.
2373
2374 711 Accident benefit period
2375 To identify the period of time for which benefits are
2376 provided in the event of an accident.
2377
2378 712 Accident benefit age limit
2379 To identify the age to which benefits are provided to
2380 the insured in the event of an accident.
2381
2382 713 Accident lifetime benefit qualification age
2383 To identify the qualification age for lifetime benefits
2384 provided to the insured in the event of an accident.
2385
2386 714 Sickness benefit period
2387 To identify the period of time for which benefits are
2388 provided in the event of sickness.
2389
2390 715 Sickness benefit age limit
2391 To identify the age to which benefits are provided to
2392 the insured in the event of sickness.
2393
2394 716 Sickness lifetime benefit qualification age
2395 To identify the qualification age for lifetime benefits
2396 provided to the insured in the event of sickness.
2397
2398 717 Accident insurance elimination period
2399 To identify the period of time the insured must be
2400 disabled in the event of an accident for benefits to be
2401 payable by the ceding company.
2402
2403 718 Sickness insurance elimination period
2404 The period of time the insured must be disabled in the
2405 event of sickness for benefits to be payable by the
2406 ceding company.
2407
2408 719 Provider signature date
2409 Date when the provider signed.
2410
2411 720 Condition initial treatment date
2412 Date when initially treated for this condition.
2413
2414 721 Information release authorization date
2415 Date when the information was authorized to be released.
2416
2417 722 Benefit release authorization date
2418 Date when a benefit is authorized for release.
2419
2420 723 Last seen date
2421 The date when last seen.
2422
2423 724 Acute manifestation date
2424 The date the symptoms manifested themselves in an acute
2425 form.
2426
2427 725 Similar illness onset date
2428 The date of the onset of an illness similar to the
2429 illness currently being treated.
2430
2431 726 Last X-ray date
2432 The date the last X-ray was taken.
2433
2434 727 Placement date, previous
2435 The date something was previously placed.
2436
2437 728 Placement date
2438 The date something is placed.
2439
2440 729 Temporary prosthesis date
2441 The date a temporary prosthetic device was provided.
2442
2443 730 Orthodontic treatment period, remaining
2444 The period of time that the orthodontic treatment has
2445 remaining.
2446
2447 731 Orthodontic treatment period, total
2448 The period of orthodontic treatment from beginning to
2449 end.
2450
2451 732 Maximum credit granted date
2452 Date on which the highest credit was granted.
2453
2454 733 Last date of accounts filed at public register
2455 Date on which accounts were last filed at the public
2456 register.
2457
2458 734 Allowed renewal duration period
2459 The period of time a company can renew its duration
2460 period.
2461
2462 735 Offset from Coordinated Universal Time (UTC)
2463 Number of hour's offset from Coordinated Universal Time
2464 (UTC).
2465
2466 736 Appointment expiry date
2467 Date when an appointment will expire.
2468
2469 737 Earliest filing period
2470 Earliest period for which a filing is made.
2471
2472 738 Original name change date
2473 Date when the original name was changed.
2474
2475 739 Education start date
2476 Date education begins at an educational institution.
2477
2478 740 Education end date
2479 Date education is completed at an educational
2480 institution.
2481
2482 741 Receivership period
2483 Period of time a receivership lasts.
2484
2485 742 Financial information submission date/time
2486 Date/time when financial information is submitted.
2487
2488 743 Purchase order latest possible change date
2489 Date identifying a point of time after which a purchase
2490 order cannot be changed.
2491
2492 744 Investment number allocation date
2493 The date that an investment number was allocated.
2494
2495 745 Payment impossible
2496 Date/time when a payment is recorded as being
2497 impossible.
2498
2499+ 746 Record extraction period
2500 The period for extraction of records.
2501
2502+ 747 Cost accounting value date
2503 Code identifying the value date of cost accounting.
2504 Value date is the date at which the entry is to effect a
2505 balance of the account.
2506
2507+ 748 Open period
2508 Code identifying the period during which something is,
2509 was or will be open.
2510
2511 ZZZ Mutually defined
2512 A code assigned within a code list to be used on an
2513 interim basis and as defined among trading partners
2514 until a precise code can be assigned to the code list.
2515
2516